From capital to electricity. From electricity to potential revenue.
The proposed model connects plant design, financing and electricity sales. This is the path being studied:
Develop
MPS prepares the plant: design, equipment, site, grid connection and operation.
Finance
Construction could combine several sources of capital, including individual participation under future terms.
Generate and sell
The plant would generate electricity to be sold under its commercial model.
Meet obligations
Project revenue would first cover costs, financing and other obligations.
Potential remuneration
A share could then remunerate investors under the future terms of a possible offer. Nothing is guaranteed.
Participation would support a whole, not a panel in your name.
The simulator’s virtual panels make a scale of participation in a shared project tangible. They do not represent ownership of physical panels.
Discover MPS001Our difference: the plant is our product.
Some platforms present projects developed by third parties. MPS aims to bring standardised design, development, future operation and financing together for its own plants.
Site conditions, grid connection, permits and operation remain specific to each project.
The MPS modelWhat if you did not need panels at home?
Residential solar and financial participation in a plant meet different needs. The former may reduce a bill; the latter would depend on the terms of a future financial product.
Scroll the table horizontally to read both columns.
| Question | Rooftop panels | Proposed MPS participation |
|---|---|---|
| Suitable roof | Required for a rooftop installation. | No personal roof required. |
| Work at home | Installation work is generally required. | No home installation. |
| Main benefit | Self-consumption and/or surplus sales depending on the agreement. | Potential financial income under a future offer’s terms. |
| Maintenance and operation | Related to the installation; responsibilities depend on agreements. | Managed by the project operator, subject to its future organisation. |
| Economic nature | Physical asset and electricity savings or sales. | Financial participation linked to a project; instrument to be determined. |
| Risks | Generation, equipment, consumption and tariffs. | Project, market, financing, liquidity, counterparty and possible loss of capital. |
| Panel ownership | Generally tied to the installation and its agreements. | Not assumed; rights would depend on the offer documents. |
Amounts, taxes, incentives and risks are not directly comparable. A numerical comparison would require a documented residential scenario.
Potential revenue. Real risks.
The reference model explores a long-term project whose revenue would depend in particular on generation, electricity prices, costs, financing and operating life. Outcomes may be lower than expected, delayed or absent; loss of capital is possible.
The current simulator illustrates a scale of generation, not a promised return or future payment. The terms, risks and any rights of an offer would be presented separately.
Frequently asked questionsToday, you can explore the model.
No offer is open. You can understand our approach, explore the simulator’s assumptions and, if you wish, register your interest without a financial commitment.